| 2400617 |
ACADEMIC SUPPORT BUILDING (MENDENHALL MAINTENANCE COMPLEX), 0077 |
DEWAYNE LOCKHART |
GRESHAM SMITH |
|
PLANNING |
$65,000,000 |
| 2501129 |
ALUMNI CENTER FACILITY, 0465 - BUILDING ENVELOPE REPAIRS |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
CONSTRUCTION |
$443,208 |
| 2501044 |
ALUMNI CENTER FACILITY, 0465 - RENOVATE ROOM 145 |
MARY LOCKHART |
DAG ARCHITECTS INC |
RAM CONSTRUCTION & DEVELOPMENT LLC |
CONSTRUCTION |
$3,000,000 |
| 2400669 |
AME, 0855, HEATING SYSTEM FOR WIND TUNNEL |
MARY JO SPECTOR |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
RAM CONSTRUCTION & DEVELOPMENT LLC |
CONSTRUCTION |
$390,150 |
| 2400620 |
ARTS DISTRICT - CONSTRUCT FACILITY AND REMODEL EXISTING SPACE |
KIM BALL |
HAMMEL, GREEN AND ABRAHAMSON INC |
|
PLANNING |
$4,467,202 |
| 2501356 |
ASKEW STUDENT LIFE CENTER, 0260 - UPGRADE LIGHTNING |
MARY LOCKHART |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
HOLD |
$4,813 |
| 2601418 |
ASKEW STUDENT LIFE CENTER, 0260 - UPGRADE OUTDOOR COURTYARD |
GEORGE JOHNSON |
|
|
PLANNING |
$0 |
| 2400850 |
ASKEW STUDENT LIFE, RM. 0101 ESPORTS GAMING LOUNGE MODIFICATIONS, 0260 |
BRIAN CANNADY |
MCGINNISS & FLEMING ENGINEERING, INC. |
SPERRY & ASSOCIATES INC |
FINAL COMPLETION |
$185,836 |
| 2501027 |
B.K. ROBERTS HALL - COLLEGE OF LAW, 0032 - ADD ACOUSTIC WALL PANELS IN CLASSROOMS 101 AND 103 |
JOHN MARCHANT |
DAG ARCHITECTS INC |
RIPPEE CONSTRUCTION, INC |
SUBST COMPLETION |
$1,660,000 |
| 2501281 |
BASKETBALL TRAINING FACILITY, 0819 - REMODEL OFFICES, LOBBY, WEIGHT ROOM, AND SHOWERS |
JEREMY FLOYD |
LEWIS AND WHITLOCK ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$750,000 |
| 2501065 |
BASKETBALL TRAINING FACILITY, 0819 - UPGRADE FIRST FLOOR HVAC |
JIMMY HOSEY |
IN-HOUSE DESIGN |
MILLERWORKS |
CONSTRUCTION |
$100,000 |
| 2400686 |
BASKETBALL TRAINING, 0819 - SOCCER SOFTBALL, 0385 - HOWSER STADIUM, 0115 - SIEMENS MIGRATION & UPGRADE |
JIMMY HOSEY |
|
SIEMENS INDUSTRY INC. |
CONSTRUCTION |
$125,000 |
| 2400821 |
BEACH VOLLEYBALL, CONSTRUCT NEW SITE, 4093 |
JEREMY FLOYD |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
HOLD |
$44,000 |
| 2500984 |
BELLAMY BUILDING, 0008 - 2ND FLOOR ECONOMICS CORRIDOR FINISH IMPROVEMENTS |
GEORGE JOHNSON |
|
|
DESIGN |
$0 |
| 2501338 |
BELLAMY BUILDING, 0008 - REMODEL ROOM 047 |
TONYARI SCOTT |
|
|
PLANNING |
$0 |
| 2501238 |
BELLAMY BUILDING, 0008 - REMODEL ROOM 241 |
TONYARI SCOTT |
DAG ARCHITECTS INC |
|
DESIGN |
$0 |
| 2400723 |
BELLAMY BUILDING, 0008 - UPGRADE INTERIOR ROOM SIGNAGE (ADA COMPLIANCE) |
DAMARIS BROWN |
|
|
PLANNING |
$50,000 |
| 2300203 |
BIO MEDICAL, 0009, BUILDING ENVELOPE |
ELSTON PEETS |
MLD ARCHITECTS |
CHILDERS CONSTRUCTION CO |
CONSTRUCTION |
$325,000 |
| 2300192 |
BIO ONE, 0039, BSIR REMODEL |
MARY JO SPECTOR |
BKJ INC |
CHILDERS CONSTRUCTION CO |
SUBST COMPLETION |
$2,785,248 |
| 2300204 |
BIO ONE, 0039, DEFERRED MAINTENANCE, REPLACEMENT OF AHU 4 |
MARY JO SPECTOR |
AFFILIATED ENGINEERS SE, INC |
CHILDERS CONSTRUCTION CO |
SUBST COMPLETION |
$245,839 |
| 2226500 |
BIO ONE, 0039, FS265, SECOND FLOOR REMODELING, TEACHING LABS |
MARY JO SPECTOR |
WALKER ARCHITECTS INC |
CHILDERS CONSTRUCTION CO |
CONSTRUCTION |
$17,208,000 |
| 2601432 |
BIOLOGY UNIT I, 0039 - INSTALL AHU FOR MICROSCOPE |
MARY JO SPECTOR |
|
|
HOLD |
$0 |
| 2501326 |
BIOLOGY UNIT I, 0039 - RENOVATE 120, 121, AND 121A FOR SHOP EQUIPMENT |
DEWAYNE LOCKHART |
AFFILIATED ENGINEERS SE, INC |
CHILDERS CONSTRUCTION CO |
BIDDING |
$100,000 |
| 2400739 |
BIOMED GENERATOR AND TRANSFER SWITCH REPLACEMENT, 0009 |
JOHN MARCHANT |
PENNONI ASSOCIATES INC |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$652,389 |
| 2501295 |
BLOSSOMS KITCHEN - RAZE FACILITIES AND RESTORE SITE |
MARISSA GUTIERREZ |
|
|
PLANNING |
$100,000 |
| 2400704 |
BRF, 0009, TUNNEL WASHER REMODELING |
MARY JO SPECTOR |
AFFILIATED ENGINEERS SE, INC |
CHILDERS CONSTRUCTION CO |
SUBST COMPLETION |
$1,004,254 |
| 2400635 |
BROWARD HALL MECHANICAL UPGRADES, 0015 |
BRIAN CANNADY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
CHILDERS CONSTRUCTION CO |
BIDDING |
$4,550,026 |
| 2300410 |
BRYAN HALL SHOWER RENOVATION AND FINISH UPGRADES, 0014 |
BRIAN CANNADY |
GILCHRIST ROSS CROWE ARCHITECTS |
CHILDERS CONSTRUCTION CO |
FINAL COMPLETION |
$2,651,852 |
| 2400706 |
BURT REYNOLDS HALL DEMOLITION |
JOSE MORALES-GONZALEZ |
MOORE BASS CONSULTING |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$680,854 |
| 2400709 |
CAGE WASH FACILITY, 4000 EXPANSION JOINT LEAK REPAIR |
BRIAN CANNADY |
|
|
PLANNING |
$0 |
| 2400776 |
CALDWELL HOUSE (VILLAGE GREEN), EXTERIOR BALCONY & 2ND FL STAIR REPLACEMENT, 0203 |
JOSE MORALES-GONZALEZ |
MLD ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
BIDDING |
$18,000 |
| 2501304 |
CAMPBELL STADIUM, 0100 - CONSTRUCT STORAGE |
OLUWASEYI AKINRINDE |
GILCHRIST ROSS CROWE ARCHITECTS |
RAM CONSTRUCTION & DEVELOPMENT LLC |
DESIGN |
$45,000 |
| 2501329 |
CAMPBELL STADIUM, 0100 - REPLACE SWITCHES 155W-22A&B |
JIMMY HOSEY |
|
|
DESIGN |
$200,000 |
| 2100156 |
CAMPUS MASTER PLAN AMENDMENT |
LORILYNE PINKERTON |
|
|
PLANNING |
$50,410 |
| 2501347 |
CAMPUS PARKING LOTS - PAVE LOTS 146, 206, 210, AND 212 |
JOSE MORALES-GONZALEZ |
PENNONI ASSOCIATES INC |
|
DESIGN |
$260,000 |
| 2501255 |
CAMPUS PARKING RAMPS - UPGRADE SECURITY |
MARY LOCKHART |
WALKER ARCHITECTS INC |
AJAX BUILDING |
DESIGN |
$3,000,000 |
| 2601364 |
CAPS HIGH-BAY LAB, 0849 - INSTALL NEW AMPLIFIERS |
JIMMY HOSEY |
|
|
DESIGN |
$58,000 |
| 2601373 |
CARNAGHI ARTS BUILDING, 45000 - REMODEL 1431J |
GEORGE JOHNSON |
|
|
PLANNING |
$0 |
| 2300218 |
CAROTHERS HALL, 0055, CODE CORRECTIONS (TKE ELEVATOR) |
ELSTON PEETS |
|
OTIS ELEVATOR COMPANY |
CONSTRUCTION |
$220,735 |
| 2300217 |
CAROTHERS, 0055, BUILDING ENVELOPE/WINDOW REPLACEMENT |
DEWAYNE LOCKHART |
GILCHRIST ROSS CROWE ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$3,099,440 |
| 2601407 |
CARRAWAY BUILDING, 0113 - INSTALL CARD ACCESS SECURITY |
GEORGE JOHNSON |
|
|
ESTIMATING |
$0 |
| 2300428 |
CARRAWAY, 0113, IAQ |
DAVID FYFFE |
|
|
PLANNING |
$3,000,000 |
| 2400785 |
CARRAWAY, ARF SHELVING ABATEMENT, 0113 |
DAMARIS BROWN |
|
|
HOLD |
$0 |
| 2501332 |
CAWTHON HALL, 0085 - MODERNIZE ELEVATOR 63202 |
BRIAN CANNADY |
THE DODSTONE GROUP ARCHITECTS INC |
|
PLANNING |
$0 |
| 2501179 |
CAWTHON HALL, 0085- MODERNIZE ELEVATOR |
BRIAN CANNADY |
|
TRANSEL ELEVATOR & ELECTRIC INC DBA TEI |
SUBST COMPLETION |
$152,047 |
| 2300368 |
CENTER FOR ENERGY INDEPENDENCE, 0830 AND 0831, CONSTRUCT FACILITY |
MARY JO SPECTOR |
WALKER ARCHITECTS INC |
D. E. SCORPIO |
DESIGN |
$6,121,500 |
| 2501161 |
CENTRAL UTILITIES PLANT, 0030 - CHILLER 2 MAINTENANCE RENEWAL |
JIMMY HOSEY |
|
TRANE TALLAHASSEE |
CONSTRUCTION |
$377,500 |
| 2501160 |
CENTRAL UTILITIES PLANT, 0030 - CHILLER FOUR WARRANTY MAINTENENCE |
JIMMY HOSEY |
|
TRANE TALLAHASSEE |
CONSTRUCTION |
$377,500 |
| 2501278 |
CENTRAL UTILITIES PLANT, 0030 - MODERNIZE CONTROLS ON BOILER B-1 |
JIMMY HOSEY |
MCCAIN ENGINEERING COMPANY INC |
|
CONSTRUCTION |
$265,000 |
| 2501180 |
CENTRAL UTILITIES PLANT, 0030 - REPAIR MEDIUM VOLTAGE CHILLER MCC3 |
JIMMY HOSEY |
|
GRAYBAR ELECTRIC |
CONSTRUCTION |
$500,000 |
| 2601397 |
CHALLENGER LEARNING CENTER, 2000 - REMODEL ROOMS 0135 AND 0136B |
GEORGE JOHNSON |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$0 |
| 2501305 |
CHALLENGER LEARNING CENTER, 2000 - REPLACE SEATING |
OLUWASEYI AKINRINDE |
|
BUSINESS INTERIORS INC |
CONSTRUCTION |
$103,300 |
| 2601365 |
CHAMPIONS HALL, 4096 - REMODEL FACILITY |
MARISSA GUTIERREZ |
|
|
PLANNING |
$0 |
| 2601372 |
CHILD DEVELOPMENT CENTER, 4033 - PLAYGROUND SITE IMPROVEMENTS |
JEREMY FLOYD |
KIMLEY-HORN AND ASSOCIATES INC |
|
PLANNING |
$58,300 |
| 2400979 |
COLLEGE OF ENGINEERING CHILLER, 0527 |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
DESIGN |
$3,000,000 |
| 2300277 |
COLLEGE OF ENGINEERING IAQ FOR A & B, 0577 & 0527 |
KIM BALL |
HEALTHCARE CONSULTING AND CONTRACTING |
APPROVED FIREPROOFING SERVICES INC |
SUBST COMPLETION |
$1,200,000 |
| 2300175 |
COLLEGE OF ENGINEERING, 0577, WINDOWS REPLACEMENT (DEF MAINTENANCE) |
KIM BALL |
GILCHRIST ROSS CROWE ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$2,765,000 |
| 2400740 |
COLLEGE OF ENGINEERING, BLDG A, FLOORING & STAIR CODE CORRECTIONS, 0577 |
KIM BALL |
|
|
CONSTRUCTION |
$682,590 |
| 2501033 |
COLLEGE OF NURSING - CONSTRUCT NEW BUILDING/NEW ADDITION |
KIM BALL |
|
|
PLANNING |
$12,000,000 |
| 2601440 |
COLLIER CLINIC (IMMOKALEE) - COLLEGE OF MEDICINE, 2600 - UPGRADE HVAC - PHASE II |
HENRY FERREE |
|
|
PLANNING |
$0 |
| 2300179 |
COLLIER CLINIC (IMMOKALEE) - COLLEGE OF MEDICINE, 2600, REROOFING |
SADIE GREINER |
SWEET SPARKMAN ARCHITECTS |
AJAX BUILDING |
CONSTRUCTION |
$1,073,157 |
| 2400636 |
COLLIER CLINIC (MMOKALEE) - COLLEGE OF MEDICINE, 2600 - HVAC SYSTEM MAINTENANCE |
SADIE GREINER |
WPS GOLDER |
AJAX BUILDING |
CONSTRUCTION |
$1,911,315 |
| 2300443 |
COLLINS ELEVATOR (TKE ELEVATOR), 0042 |
ELSTON PEETS |
|
OTIS ELEVATOR COMPANY |
CONSTRUCTION |
$410,000 |
| 2300212 |
COLLINS RESEARCH BUILDING, 0042, BUILDING ENVELOPE |
ELSTON PEETS |
MLD ARCHITECTS |
CHILDERS CONSTRUCTION CO |
CONSTRUCTION |
$900,000 |
| 2501022 |
COLLINS, 0042 - HELIUM REFRIGERATOR -RENOVATE ROOMS 0003 AND 0011 |
MARY JO SPECTOR |
MCGINNISS & FLEMING ENGINEERING, INC. |
|
PLANNING |
$4,300,000 |
| 2300249 |
COM - RESEARCH, 4002, BUILDING ENVELOPE |
BRIAN CANNADY |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
KRYSTAL KLEAN |
CONSTRUCTION |
$514,232 |
| 2501323 |
COM - THRASHER BUILDING, 4001 - RENOVATE DOCTOR'S INN ROOM 1170 |
TONYARI SCOTT |
|
CONSTRUCTION SOLUTIONS LLC |
CONSTRUCTION |
$18,100 |
| 2300191 |
COM - THRASHER, 4001, REROOF |
ELSTON PEETS |
GILCHRIST ROSS CROWE ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$3,500,000 |
| 2400774 |
COM/THRASHER/RESEARCH, FLOORING REPLACEMENT, 4001 |
BRIAN CANNADY |
|
***DO NOT USE, USE ID # 55339****
LINK FLOORS, INC |
FINAL COMPLETION |
$931,391 |
| 2400576 |
CRIMINOLOGY AND JUSTICE BUILDING ENVELOPE/REROOF, 0005 |
JOHN MARCHANT |
GILCHRIST ROSS CROWE ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
SUBST COMPLETION |
$1,178,033 |
| 2501009 |
CSL, 4008 - 5TH FLOOR LAB RESTORATION |
MARY JO SPECTOR |
AFFILIATED ENGINEERS SE, INC |
SOUTHERN STANDARD |
SUBST COMPLETION |
$1,301,170 |
| 2501093 |
CSL, 4008 - REMODEL ROOMS 2400 AND 5004 |
MARY JO SPECTOR |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
CONSTRUCTION |
$161,175 |
| 2400610 |
CUP 5KV BREAKER AND RELAY REPLACEMENT, 0030 |
JIMMY HOSEY |
GRAYBAR ELECTRIC |
GRAYBAR ELECTRIC |
CONSTRUCTION |
$100,000 |
| 2400612 |
CUP/BAS SUPERVISOR REPLACEMENT (CONTROLS), 0030 |
JIMMY HOSEY |
|
SIEMENS INDUSTRY INC. |
CONSTRUCTION |
$125,000 |
| 2400936 |
DAVID MIDDLETON GOLF CENTER, 0062, REPLACE CHILLER |
JIMMY HOSEY |
IN-HOUSE DESIGN |
BROOKS BUILDING SOLUTIONS |
SUBST COMPLETION |
$725,000 |
| 2501309 |
DC MAGNET BUILDING NATIONAL HIGH MAGNETIC FIELD LABORATORY, 0069 - INSTALL EXHAUST FANS IN ROOM P0142 AND A110 |
JIMMY HOSEY |
PINNACLE ENGINEERING GROUP, P.A. |
|
DESIGN |
$24,000 |
| 2501283 |
DC MAGNET BUILDING, 0069 - AND NMR, 0269 - CLEAN AC UNITS AND DUCTWORK |
JOHN MARCHANT |
|
|
CONSTRUCTION |
$850,000 |
| 2322900 |
DEFERRED MAINTENANCE 2022-23, HOLLEY BUILDING, 1015 |
SADIE GREINER |
|
|
PLANNING |
$5,000,000 |
| 2322800 |
DEFERRED MAINTENANCE 22-23 (OMNI PROJ NO FOR ALL DM PROJECTS THIS FY) |
SADIE GREINER |
|
|
PLANNING |
$66,187,052 |
| 2601375 |
DIFFENBAUGH BUILDING, 0002 - REMODEL 007, 005, AND 001A-C FOR LINGUISTICS LAB |
GEORGE JOHNSON |
|
|
PLANNING |
$0 |
| 2300225 |
DIFFENBAUGH, 0002, BUILDING STEEP SLOPE REROOF |
ELSTON PEETS |
MLD ARCHITECTS |
TO BE DETERMINED |
SUBST COMPLETION |
$667,632 |
| 2300128 |
DIFFENBAUGH, 0002, IAQ |
DAVID FYFFE |
RAYMOND ENGINEERING - GEORGIA INC |
|
PLANNING |
$4,000,000 |
| 2400830 |
DIFFENBAUGH, RM 0413 FINISHES & LIGHTING RENOVATION, 0002 |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
|
CONSTRUCTION |
$70,300 |
| 2501187 |
DIRAC SCIENCE LIBRARY, 0020 - REMODEL SPACE 0217-0219 FOR STARBUCKS |
JOSE MORALES-GONZALEZ |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
CONSTRUCTION |
$862,010 |
| 2300220 |
DITTMER, 0038, BUILDING ENVELOPE (PARAPET WALL) |
DEWAYNE LOCKHART |
LEWIS AND WHITLOCK ARCHITECTS |
AJAX BUILDING |
CONSTRUCTION |
$2,600,000 |
| 2300219 |
DITTMER, 0038, CODE CORRECTIONS, ELEVATOR UPDATE |
DEWAYNE LOCKHART |
THYSSENKRUPP ELEVATORS |
THYSSENKRUPP ELEVATORS |
CONSTRUCTION |
$800,000 |
| 2300166 |
DITTMER, 0038, DEFERRED MAINTENANCE (STAIRS) |
DEWAYNE LOCKHART |
PENNONI ASSOCIATES INC |
AJAX BUILDING |
CONSTRUCTION |
$1,200,000 |
| 2400616 |
DITTMER, 0038, REMODELING |
DEWAYNE LOCKHART |
HELLMUTH, OBATA, & KASSABAUM, INC (HOK) |
|
PLANNING |
$95,400,000 |
| 2300165 |
DITTMER, 0038, REROOFING-FULL TEAR-OFF 060MIL PVC HYBRID-ROOF CONNECT |
DEWAYNE LOCKHART |
LEWIS AND WHITLOCK ARCHITECTS |
ROOF CONNECT |
CONSTRUCTION |
$1,400,000 |
| 2327200 |
DOAK CAMPBELL STADIUM PREMIUM SEATING ENHANCEMENTS, 0100 |
MATT NOONE |
POPULOUS - CONTRACTED THROUGH BOOSTERS, NOT FSU - SET UP FOR TRACKING PURPOSES ONLY |
MANHATTAN CULPEPPER JOINT VENTURE |
CONSTRUCTION |
$205,000,000 |
| 2601370 |
DOAK CAMPBELL STADIUM, 0100 - REMODEL FOR 2 FSU STORE LOCATIONS |
OLUWASEYI AKINRINDE |
PENNONI ASSOCIATES INC |
|
BIDDING |
$15,700 |
| 2221100 |
DOAK CAMPBELL STADIUM, REPAIRS AND IMPROVEMENTS, 0100 |
JEREMY FLOYD |
GILCHRIST ROSS CROWE ARCHITECTS |
RAM CONSTRUCTION & DEVELOPMENT LLC |
CONSTRUCTION |
$20,000,000 |
| 2300154 |
DODD, 0004, BUILDING ENVELOPE
WINDOW RESTORATION AND/OR REPLACEMENT
DESIGN REQUIRED |
DEWAYNE LOCKHART |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
FAGAN CONSTRUCTION SERVICES |
CONSTRUCTION |
$755,650 |
| 2501236 |
DUNLAP SUCCESS CENTER, 4011 - RENOVATE ROOM 1200 |
TONYARI SCOTT |
|
BUSINESS INTERIORS INC |
SUBST COMPLETION |
$36,000 |
| 2501242 |
DUXBURY HALL, 0040 - REMODEL 2ND FLOOR TR |
OLUWASEYI AKINRINDE |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$13,400 |
| 2400758 |
DUXBURY HALL, 0040 - REMODEL SUITE 0310 |
TONYARI SCOTT |
|
PEREZ CONSTRUCTION INC |
PLANNING |
$75,553 |
| 2601415 |
EARTH, OCEAN & ATMOSPHERIC SCIENCE BUILDING, 4010 - REMODEL SPACE 3061 |
JIMMY HOSEY |
|
|
PLANNING |
$0 |
| 2300476 |
ENGINEERING LAB BUILDING REMODELING, 0114 |
DAVID FYFFE |
|
|
PLANNING |
$5,000,000 |
| 2400618 |
FAMU-FSU COLLEGE OF ENGINEERING BUILDING C |
KIM BALL |
HELLMUTH, OBATA, & KASSABAUM, INC (HOK) |
|
PLANNING |
$65,000,000 |
| 2300531 |
FAR BUILDING RENOVATION 0190A, 3801 |
TONYARI SCOTT |
BKJ INC |
COOK BROTHERS, INC |
CONSTRUCTION |
$850,000 |
| 2400627 |
FHP BUILDING (8050) - DEMOLISH BUILDING |
JOSE MORALES-GONZALEZ |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$75,000 |
| 2300514 |
FINE ARTS ANNEX RADON MITIGATION, 0436 |
JOHN MARCHANT |
ENVIROHOME |
SMITH & SMITH CONTRACTING |
BIDDING |
$32,000 |
| 2300563 |
FINE ARTS BUILDING RENOVATION, 0007 |
KIM BALL |
|
|
PLANNING |
$2,000,000 |
| 2501212 |
FINE ARTS BUILDING, 0007 - RENOVATE ROOM 249 SEATING, FLOORING |
OLUWASEYI AKINRINDE |
|
PERDUE INC |
FINAL COMPLETION |
$150,000 |
| 2500982 |
FINE ARTS BUILDING, 0007 - REPLACE TRACK LIGHTING AND ADD DIMMABLE SWITCHING IN MULTIPLE ROOMS |
JIMMY HOSEY |
H2ENGINEERING, INC |
|
DESIGN |
$180,000 |
| 2501002 |
FINE ARTS BUILDING, 0007 - ROOM 0120 AND 0121 HVAC IMPROVEMENTS |
JIMMY HOSEY |
|
FSM ENERGY LLC |
CONSTRUCTION |
$148,793 |
| 2300499 |
FINE ARTS RADON MITIGATION, 0007 |
JOHN MARCHANT |
ENVIROHOME |
SMITH & SMITH CONTRACTING |
BIDDING |
$56,300 |
| 2300199 |
FINE ARTS, 0007, BUILDING ENVELOPE |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
CONSTRUCTION |
$1,600,000 |
| 2300143 |
FINE ARTS, 0007, REROOFING, RECOVER SINGLE PLY 60 MIL-ROOF CONNECT |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
SUBST COMPLETION |
$1,000,000 |
| 2501215 |
FISHER LECTURE HALL, 0037 - RENOVATE ROOMS 255 AND 275 SEATING AND FLOORING |
OLUWASEYI AKINRINDE |
|
PERDUE INC |
FINAL COMPLETION |
$445,000 |
| 2326200 |
FOOTBALL OPERATIONS FACILITY |
DOUG DOUCETTE |
POPULOUS - CONTRACTED THROUGH BOOSTERS, NOT FSU - SET UP FOR TRACKING PURPOSES ONLY |
THE WHITING-TURNER CONTRACTING COMPANY |
CONSTRUCTION |
$149,000,000 |
| 2400688 |
FOUNDATION BUILDING, SIEMENS MIGRATION & UPGRADE, 2020 |
JIMMY HOSEY |
|
SIEMENS INDUSTRY INC. |
CONSTRUCTION |
$105,000 |
| 2300316 |
FSU ACADEMIC HEALTH CENTER, 7400, CONSTRUCT FACILITY |
ERIC LOWE |
HELLMUTH, OBATA, & KASSABAUM, INC (HOK) |
AJAX BUILDING |
CONSTRUCTION |
$137,500,000 |
| 2601423 |
FSU HEALTH - NURSING, 7402 - INSTALL EXTERIOR MONUMENT SIGN |
DAMARIS BROWN |
|
|
PLANNING |
$0 |
| 2501205 |
FSU HEALTH - PHILLIPS ROAD, 7401 - REMODEL |
JEREMY FLOYD |
GILCHRIST ROSS CROWE ARCHITECTS |
SOUTHERN STANDARD |
CONSTRUCTION |
$1,400,000 |
| 2501162 |
FSUS AUDITORIA 9, 2009 - REMODEL ROOM 09-130 |
BRIAN CANNADY |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
HOLD |
$300,000 |
| 2501163 |
FSUS AUDITORIA 9, 2009 - RESHINGLE BUILDING ROOF |
BRIAN CANNADY |
DAVID H. MELVIN,INC., CONSULTING ENGINEERS |
SOUTHERN STANDARD |
CONSTRUCTION |
$334,327 |
| 2501237 |
FSUS BASEBALL AND SOFTBALL CONCESSIONS, 2030 - CONSTRUCT BUILDINGS |
BRIAN CANNADY |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$425,000 |
| 2501165 |
FSUS BASEBALL STADIUM, 2033 - BASEBALL COMPLEX RENOVATIONS |
BRIAN CANNADY |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
DESIGN |
$745,000 |
| 2501140 |
FSUS HIGH & MIDDLE SCHOOL, 2003 - EVALUATE WALL & CONCRETE CRACKING ON SW EXTERIOR |
BRIAN CANNADY |
PENNONI ASSOCIATES INC |
|
DESIGN |
$5,525 |
| 2501164 |
FSUS PRIMARY SCHOOL BUILDING 6, 2006 - RENOVATE PLAYGROUND DECK |
BRIAN CANNADY |
|
SOUTHERN STANDARD |
CONSTRUCTION |
$464,465 |
| 2501053 |
FSUS STEAM BUILDING, 2043 - INSTALL ACOUSTIC STAGE CURTAINS |
BRIAN CANNADY |
|
CULPEPPER CONSTRUCTION |
SUBST COMPLETION |
$255,932 |
| 2400753 |
FUQUA RESEARCH/SLIGER, 1ST FLOOR IT EXPANSION FOR FAMU PD, 0804 |
JIMMY HOSEY |
GILCHRIST ROSS CROWE ARCHITECTS |
SUN COAST ELECTRIC |
DESIGN |
$111,218 |
| 2300348 |
GATEWAY ROAD ALIGNMENT STUDY |
JEREMY FLOYD |
GENESIS HALFF INC |
|
DESIGN |
$30,850 |
| 2501178 |
GILCHRIST HALL, 0016- MODERNIZE ELEVATOR |
BRIAN CANNADY |
|
THYSSENKRUPP ELEVATORS |
CONSTRUCTION |
$140,800 |
| 2400633 |
GREENE-LEWIS HOUSE, 4255 - RENOVATE SPACE FOR NATIVE AMERICAN & INDIGENOUS STUDIES |
JEREMY FLOYD |
ELLIOTT MARSHALL INNES PA (EMI) |
SOUTHERN STANDARD |
CONSTRUCTION |
$679,000 |
| 2501246 |
HASKIN CIRCUS COMPLEX, 0117 - ADD WASHER/DRYER HOOKUPS IN RM 201 |
MARISSA GUTIERREZ |
PINNACLE ENGINEERING GROUP, P.A. |
|
CONSTRUCTION |
$34,000 |
| 2500981 |
HASKIN CIRCUS COMPLEX, 0117 - CIRCUS TENT CONCRETE FLOOR REPLACEMENT |
JOSE MORALES-GONZALEZ |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
SUBST COMPLETION |
$910,475 |
| 2501077 |
HASKIN CIRCUS COMPLEX, 0117 - REPLACE CIRCUS BUILDING SLIDING DOORS |
MARISSA GUTIERREZ |
|
|
PLANNING |
$0 |
| 2400717 |
HCB, 4009, ELEVATOR UPGRADES |
ELSTON PEETS |
|
OTIS ELEVATOR COMPANY |
CONSTRUCTION |
$403,008 |
| 2501060 |
HECHT HOUSE, 0294 - REMODEL FIRST FLOOR |
KIM BALL |
LEWIS AND WHITLOCK ARCHITECTS |
CULPEPPER CONSTRUCTION |
SUBST COMPLETION |
$780,000 |
| 2501121 |
HONORS SCHOLARS & FELLOWS, 4029 - FRAME DIGITAL SIGNAGE AT 2001 |
GEORGE JOHNSON |
|
PEREZ CONSTRUCTION INC |
CONSTRUCTION |
$8,388 |
| 2300431 |
HOUSEWRIGHT ACOUSTIC UPGRADES AND FINISHES, 0054 |
TONYARI SCOTT |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
CONSTRUCTION SOLUTIONS LLC |
CONSTRUCTION |
$1,900,000 |
| 2400822 |
HOWSER BASEBALL FACILITY UPGRADES, 0115 |
JOHN MARCHANT |
LITTLE BLUE HERON HOLDINGS |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$1,330,840 |
| 2501312 |
HOWSER STADIUM, 00115 - UPGRADE FACILITY PHASE 2 |
JOHN MARCHANT |
|
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$750,000 |
| 2501327 |
HOWSER STADIUM, 0115 - MODERNIZE STADIUM |
JEREMY FLOYD |
|
|
HOLD |
$0 |
| 2501078 |
HOWSER STADIUM, 0115 - REPAIR/REPLACE ROOF |
JOHN MARCHANT |
LITTLE BLUE HERON HOLDINGS |
ROOF CONNECT |
CONSTRUCTION |
$75,000 |
| 2501258 |
HOWSER STADIUM, 0115 - REPLACE ELEVATOR |
JOHN MARCHANT |
|
|
HOLD |
$0 |
| 2601428 |
HOWSER STADIUM, 0115 - UPGRADE SCOREBOARD |
JOHN MARCHANT |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
FORMETCO |
CONSTRUCTION |
$1,250,000 |
| 2601416 |
IRCB BUILDING, 0870 - REMODEL ROOM 0154 AND 0155 |
MARY JO SPECTOR |
|
|
PLANNING |
$500,000 |
| 1527500 |
IRCB, 0870, INTERDISCIPLINARY RESEARCH & COMMERCIALIZATION BUILDING |
MARY JO SPECTOR |
WILSON ARCHITECTS INC |
THE WHITING-TURNER CONTRACTING COMPANY |
SUBST COMPLETION |
$126,000,000 |
| 2300505 |
JENNIE MURPHREE HALL GENERATOR UPGRADE, 0012 |
BRIAN CANNADY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
RT ELECTRIC LLC |
CONSTRUCTION |
$79,322 |
| 2200031 |
JENNIE MURPHREE HALL, 0012, AIR HANDLER REPLACEMENT |
BRIAN CANNADY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
MAD DOG DESIGN & CONSTRUCTION CO |
SUBST COMPLETION |
$700,000 |
| 2300442 |
JOHNSTON, 0017 - LIGHTING AND ELECTRICAL |
OLUWASEYI AKINRINDE |
|
|
HOLD |
$75,783 |
| 2501320 |
KEEN BUILDING, 0041 - INSTALL HOOD IN 105 |
DEWAYNE LOCKHART |
AFFILIATED ENGINEERS SE, INC |
CULPEPPER CONSTRUCTION |
BIDDING |
$110,000 |
| 2601430 |
KEEN BUILDING, 0041 - REMODEL ROOMS IN BASEMENT |
MARY JO SPECTOR |
LEWIS AND WHITLOCK ARCHITECTS |
|
PLANNING |
$25,000 |
| 2400911 |
KEEN BUILDING, 0041, BASEMENT REMODEL |
MARY JO SPECTOR |
LEWIS AND WHITLOCK ARCHITECTS |
CULPEPPER CONSTRUCTION |
CONSTRUCTION |
$3,800,000 |
| 2400716 |
KELLOGG, 0006, CONNECTOR |
MARY JO SPECTOR |
LEWIS AND WHITLOCK ARCHITECTS |
|
HOLD |
$0 |
| 2221200 |
KELLOGG, 0006, REMODEL |
MARY JO SPECTOR |
LEWIS AND WHITLOCK ARCHITECTS |
ALLSTATE CONSTRUCTION |
DESIGN |
$22,400,000 |
| 2501342 |
KEMPER LAB (OGZEB), 4114 - RAZE FACILITY |
DAVID FYFFE |
|
|
PLANNING |
$0 |
| 2501322 |
KUERSTEINER MUSIC BUILDING, 0089 - CONSTRUCT NEW WIRING CLOSETS ON MULTIPLE FLOORS |
TONYARI SCOTT |
|
|
PLANNING |
$0 |
| 2501321 |
KUERSTEINER MUSIC BUILDING, 0089 - ENLARGE STAGE EQUIPMENT STORAGE CLOSET |
TONYARI SCOTT |
|
|
DESIGN |
$0 |
| 2500989 |
KUERSTEINER MUSIC BUILDING, 0089 - RENOVATE TEACHING LAB 208 |
JOSE MORALES-GONZALEZ |
ELLIOTT MARSHALL INNES PA (EMI) |
SOUTHERN STANDARD |
DESIGN |
$1,000,000 |
| 2300548 |
KUERSTEINER, RADON MITIGATION PH 2, 0089 |
JOHN MARCHANT |
|
SMITH & SMITH CONTRACTING |
CONSTRUCTION |
$18,200 |
| 2400914 |
KUERSTEINER/OPPERMAN MUSIC HALL, REPLACE LIGHTING DIMMER RACKS, 0089 |
JOSE MORALES-GONZALEZ |
PINNACLE ENGINEERING GROUP, P.A. |
BARBIZON FLORIDA |
SUBST COMPLETION |
$353,913 |
| 2601404 |
LAW RESEARCH CENTER (LIBRARY) - COLLEGE OF LAW, 0047 - ADD GLASS WALL TO L315 |
GEORGE JOHNSON |
|
|
ESTIMATING |
$0 |
| 2400720 |
LAW SCHOOL ADVOCACY CENTER, 4040, REMODEL 2ND FLOOR OFFICES |
JOHN MARCHANT |
BKJ INC |
RIPPEE CONSTRUCTION, INC |
SUBST COMPLETION |
$750,000 |
| 2501259 |
LEACH CENTER, 0026 - REPLACE AHUS AND FAN COIL UNITS |
JOHN MARCHANT |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$3,115,114 |
| 1820600 |
LEGACY HALL, 4540, COLLEGE OF BUSINESS |
KIM BALL |
GOODY CLANCY |
CULPEPPER CONSTRUCTION |
SUBST COMPLETION |
$160,000,000 |
| 2501085 |
LONGMIRE BUILDING, 0072 - REMODEL SUITE 110D |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
|
HOLD |
$17,500 |
| 2300549 |
LONGMIRE, RADON MITIGATION PH 2, 0072 |
JOHN MARCHANT |
|
SMITH & SMITH CONTRACTING |
CONSTRUCTION |
$10,000 |
| 2601413 |
LOVE BUILDING - HURRICANE ASSESSMENT |
JUSTIN SHAFER |
|
|
DESIGN |
$0 |
| 2501241 |
LOVE BUILDING, 0116 - EXPAND 1ST FLOOR TR ROOM |
OLUWASEYI AKINRINDE |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$55,000 |
| 2300211 |
LOVE BUILDING, 0116, BUILDING ENVELOPE |
DEWAYNE LOCKHART |
LEWIS AND WHITLOCK ARCHITECTS |
CHILDERS CONSTRUCTION CO |
CONSTRUCTION |
$1,390,000 |
| 2400718 |
LOVE, 0116, DEFERRED MAINTENANCE |
JIMMY HOSEY |
|
SIEMENS INDUSTRY INC. |
CONSTRUCTION |
$849,000 |
| 2501276 |
MAG, 0022 - MODIFY FIRE PROTECTION IN A102 |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
HOLD |
$0 |
| 2601414 |
MARINE LAB - ADMIN BUILDING, 0462 - STUDY |
MARY JO SPECTOR |
|
|
HOLD |
$0 |
| 2300162 |
MARINE LAB, 0408, BUILDING ENVELOPE (REROOFING AND BUILDING ENVELOPE SCOPE DESCRIPTION APPROVED BY SUS DEFERRED BUILDING MAINTENANCE PROGRAM) |
MARY JO SPECTOR |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
SOUTHERN STANDARD |
SUBST COMPLETION |
$275,000 |
| 2400890 |
MARINE LAB, 0408, REPLACE CATHODIC PROTECTION SYSTEM |
MARY JO SPECTOR |
PENNONI ASSOCIATES INC |
|
DESIGN |
$500,000 |
| 2501135 |
MARINE LAB, 2221 - REPLACE DOMESTIC WATER SYSTEM |
MARY JO SPECTOR |
|
|
CONSTRUCTION |
$145,000 |
| 2400638 |
MARINE LAB, 2225, RESTROOM FACILITY |
MARY JO SPECTOR |
IN-HOUSE DESIGN |
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$192,965 |
| 2400674 |
MARINE LAB, 2226, BOAT STORAGE 2 |
MARY JO SPECTOR |
|
RIPPEE CONSTRUCTION, INC |
BIDDING |
$94,613 |
| 2501150 |
MARRIAGE AND FAMILY CLINIC, 0443 - RENOVATE INTERIOR |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$0 |
| 2300323 |
MARYLAND CIRCLE REMODEL PHASE II (MDC-MULTI-DISCIPLINARY CTR), 3403 |
ELSTON PEETS |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$4,000,000 |
| 2300206 |
MARYLAND CIRCLE, 3403, BUILDING ENVELOPE |
ELSTON PEETS |
MLD ARCHITECTS |
TO BE DETERMINED |
SUBST COMPLETION |
$859,600 |
| 2601395 |
MCCOLLUM HALL, 0075 - REMOVE CELL TOWER FROM ROOF |
JUSTIN SHAFER |
|
|
PLANNING |
$0 |
| 2300371 |
MCINTOSH BUILDING REMODEL, ISSM LABS AND CLINICAL SPACE, 0091 |
KIM BALL |
LEWIS AND WHITLOCK ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
FINAL COMPLETION |
$993,000 |
| 2501197 |
MIDDLETON GOLF COURSE, 0062 - CONSTRUCT ADDITION |
JEREMY FLOYD |
LEWIS AND WHITLOCK ARCHITECTS |
|
PLANNING |
$5,000,000 |
| 2601411 |
MIDDLETON MAINTENANCE FACILITY, 8065 - CONSTRUCT FACILITY |
JEREMY FLOYD |
|
|
PLANNING |
$420,000 |
| 2400613 |
MONTGOMERY GYM, MAIN SEWER LINE REPLACEMENT, 0025 |
JEREMY FLOYD |
MOORE BASS CONSULTING |
RIPPEE CONSTRUCTION, INC |
SUBST COMPLETION |
$250,000 |
| 2501142 |
MONTGOMERY, 0025 - FLOORING REPLACEMENT |
JOHN MARCHANT |
|
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$1,900,000 |
| 2400679 |
MOORE AUDITORIUM RENOVATION, 0195 |
KIM BALL |
|
|
PLANNING |
$17,000,000 |
| 2400823 |
MORCOM AQUATICS CENTER, DIVE TOWER REPAIRS, 8008 |
BRIAN CANNADY |
PENNONI ASSOCIATES INC |
AJAX BUILDING |
FINAL COMPLETION |
$902,706 |
| 2601394 |
MORGAN BUILDING - FUQUA RESEARCH COMPLEX, 0805 - REMODEL 2ND FLOOR FOR FSUPD DISPATCH |
JUSTIN SHAFER |
|
|
PLANNING |
$0 |
| 2501287 |
MULTIPLE BUILDING - BREACHED DOOR REPAIR (EMERGENCY EVENT 04/17/25) |
JOHN MARCHANT |
|
SOUTHERN STANDARD |
SUBST COMPLETION |
$735,000 |
| 2501324 |
MULTIPLE BUILDINGS - EMERGENCY ACCESS AND SECURITY DOOR UPGRADES |
JUSTIN SHAFER |
|
SOUTHERN STANDARD |
CONSTRUCTION |
$2,000,000 |
| 2400622 |
MULTIPURPOSE EDUCATIONAL FACILITY, INSTALL AC, 8010 |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
MILLERWORKS |
CONSTRUCTION |
$140,000 |
| 2400833 |
NEW LACROSSE FIELD AND FACILITY |
JEREMY FLOYD |
HARVARD JOLLY, INC DBA PBK |
D. E. SCORPIO |
CONSTRUCTION |
$17,500,000 |
| 2501186 |
NEW STUDENT UNION, 4018 - INSTALL WALL COVERING IN FOOD COURT |
GEORGE JOHNSON |
|
|
ESTIMATING |
$0 |
| 2400958 |
NEW STUDENT UNION, 4018 - ADD POWER WINDOW SHADE IN 2205 BALLROOM E |
KIM BALL |
|
SUN COAST ELECTRIC |
SUBST COMPLETION |
$31,845 |
| 2501297 |
NEW STUDENT UNION, 4018 - INSTALL SECURITY GATE ARM |
JOSE MORALES-GONZALEZ |
KIMLEY-HORN AND ASSOCIATES INC |
CULPEPPER CONSTRUCTION |
FINAL COMPLETION |
$550,000 |
| 2501200 |
NEW STUDENT UNION, 4018 - INSTALL SWINGING BENCH |
JEREMY FLOYD |
|
|
HOLD |
$0 |
| 2501256 |
NEW STUDENT UNION, 4018 - REPAIR DOORS AT 0132 AND 0134 |
KIM BALL |
|
KRUEGER INTERNATION INC |
CONSTRUCTION |
$13,171 |
| 2501345 |
NEW STUDENT UNION, 4018 - UPGRADE SOUTH PATIO |
JEREMY FLOYD |
LEWIS AND WHITLOCK ARCHITECTS |
|
HOLD |
$100,000 |
| 2501169 |
NEW STUDENT UNION, 4018 - WALL RECONFIGURATION, ADD POWER AND DATA |
GEORGE JOHNSON |
|
SUN COAST ELECTRIC |
CONSTRUCTION |
$5,615 |
| 2400644 |
NHFML MAG LAB, 0069 - NEW COOLING TOWER, REPLACE MCC3 AND MCC4 |
JIMMY HOSEY |
MCGINNISS & FLEMING ENGINEERING, INC. |
SOUTHERN STANDARD |
DESIGN |
$3,000,000 |
| 2000062 |
NHMFL (MAG LAB), PRIMARY ELECTRICAL SERVICE EXPANSION |
KIM BALL |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
CONSTRUCTION |
$26,250,000 |
| 2300264 |
NHMFL (MAGLAB), 0022, REPLACE GENERATOR |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
SOUTHERN STANDARD |
FINAL COMPLETION |
$1,250,000 |
| 2300412 |
NHMFL (MAGLAB), 0269, NMR WING EMERGENCY CIRCUIT RECONFIGURE |
JIMMY HOSEY |
PINNACLE ENGINEERING GROUP, P.A. |
SUMMIT ELECTRICAL LLC |
CONSTRUCTION |
$35,000 |
| 2300276 |
NHMFL(MAGLAB), 0022 , IAQ, MOLD REMEDIATION |
JOHN MARCHANT |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
APPROVED FIREPROOFING SERVICES INC |
CONSTRUCTION |
$3,150,000 |
| 2601437 |
NPHC PARK - IMPROVE SITE SECURITY |
MARISSA GUTIERREZ |
|
|
PLANNING |
$0 |
| 2400904 |
NURSERY GREENHOUSE, DEMO EXISTING AND CONSTRUCT NEW GREENHOUSE, 0088 |
JEREMY FLOYD |
|
|
HOLD |
$0 |
| 2400626 |
NW CAMPUS HOUSING, DINING SERVICES, PARKING GARAGE |
ERIC LOWE |
WALKER ARCHITECTS INC |
|
PLANNING |
$16,855,000 |
| 2501268 |
NWRDC, 0380 - CONSTRUCT ADA SIDEWALK TO FRONT ENTRANCE |
OLUWASEYI AKINRINDE |
PENNONI ASSOCIATES INC |
|
HOLD |
$18,000 |
| 2501275 |
NWRDC, 0380 - CONSTRUCT VEHICULAR BARRIER AT WEST AND SOUTH SIDE OF BUILDING |
OLUWASEYI AKINRINDE |
|
|
HOLD |
$0 |
| 2501267 |
NWRDC, 0380 - INSPECT BUILDING FOR HURRICANE RATING IMPACTS |
OLUWASEYI AKINRINDE |
|
|
STUDY |
$7,500 |
| 2501171 |
PANAMA CITY - HOLLEY ACADEMIC CENTER, 1015 - RENOVATE C104 AND C104A |
BRIAN CANNADY |
DAG ARCHITECTS INC |
SOUTHERN STANDARD |
DESIGN |
$375,000 |
| 2400621 |
PANAMA CITY BEACH HEALTH ACADEMIC RESEARCH CENTER |
SADIE GREINER |
|
|
HOLD |
$100,000,000 |
| 2300189 |
PANAMA CITY CAMPUS, BLDGS DM |
BRIAN CANNADY |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$3,110,000 |
| 2501248 |
PANAMA CITY TECHNOLOGY BUILDING B SOUTH, 1007 - ADD DOORS TO B237 AND B0150A |
BRIAN CANNADY |
DAG ARCHITECTS INC |
|
CONSTRUCTION |
$186,334 |
| 2300251 |
PANAMA CITY, VARIOUS BUILDINGS, REROOFING |
BRIAN CANNADY |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
DGM CONSTRUCTION SERVICES |
CONSTRUCTION |
$1,873,854 |
| 2501172 |
PARKING GARAGE #1- WOODWARD AVENUE, 0070- MODERNIZE ELEVATOR |
ELSTON PEETS |
|
TRANSEL ELEVATOR & ELECTRIC INC DBA TEI |
CONSTRUCTION |
$185,000 |
| 2501174 |
PARKING GARAGE #2- TRADITIONS WAY, 0378 - MODERNIZE ELEVATOR |
ELSTON PEETS |
|
TRANSEL ELEVATOR & ELECTRIC INC DBA TEI |
CONSTRUCTION |
$129,246 |
| 2501310 |
PARKING GARAGE 1 - WOODWARD AVE, 0070 - CAPITAL MAINTENANCE |
MARY LOCKHART |
WALKER ARCHITECTS INC |
|
DESIGN |
$1,300,000 |
| 2400668 |
PARKING GARAGE 1 - WOODWARD AVE, 0070, RENOVATE FIRST FLOOR |
JOHN MARCHANT |
LEWIS AND WHITLOCK ARCHITECTS |
CHILDERS CONSTRUCTION CO |
CONSTRUCTION |
$3,600,000 |
| 2300244 |
PEPPER, 0057, DEFERRED MAINTENANCE/ENVELOPE |
ELSTON PEETS |
GILCHRIST ROSS CROWE ARCHITECTS |
CHILDERS CONSTRUCTION CO |
SUBST COMPLETION |
$1,700,000 |
| 2300168 |
PEPPER, 0057, REROOFING WITH STANDING SEAM, RE-GUTTER. |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
FINAL COMPLETION |
$3,000,000 |
| 2501191 |
PRESIDENT'S HOUSE, 4012 - UPGRADE GATE ACCESS |
JEREMY FLOYD |
KIMLEY-HORN AND ASSOCIATES INC |
|
HOLD |
$51,300 |
| 2501106 |
PUBLIC BROADCAST CENTER, 0018 - UPGRADE SATELLITE OPERATIONS CENTER |
MARY LOCKHART |
|
|
CONSTRUCTION |
$180,464 |
| 2501081 |
PUBLIC BROADCAST CENTER, 0018 - UPGRADE SECURITY SYSTEM |
MARY LOCKHART |
LEWIS AND WHITLOCK ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
DESIGN |
$24,469 |
| 2300205 |
RECYCLING/SOLID WASTE, 4501, BUILDING ENVELOPE |
BRIAN CANNADY |
|
BIG BEND BUILDERS, LLC |
SUBST COMPLETION |
$316,778 |
| 2501181 |
RESEARCH BUILDING - COLLEGE OF MEDICINE, 4002 - REMODEL ROOM 3311A AND 3311B |
OLUWASEYI AKINRINDE |
DAG ARCHITECTS INC |
MILLS & MCKINNON CONTRACTORS, INC |
CONSTRUCTION |
$156,000 |
| 2501210 |
RESEARCH BUILDING - COLLEGE OF MEDICINE, 4002 - RENOVATE ANATOMY LAB EXHAUST SYSTEM |
JOHN MARCHANT |
PINNACLE ENGINEERING GROUP, P.A. |
MAD DOG DESIGN & CONSTRUCTION CO |
BIDDING |
$80,000 |
| 2501306 |
REYNOLDS HALL - GROUND FLOOR LIFT REPLACEMENT |
BRIAN CANNADY |
|
|
PLANNING |
$0 |
| 2300506 |
REYNOLDS HALL GENERATOR UPGRADE, 0013 |
BRIAN CANNADY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
HOLD |
$96,588 |
| 2601424 |
RICHARDS BUILDING, 0045 - RENOVATE ROOM 101 |
DAMARIS BROWN |
|
|
ESTIMATING |
$0 |
| 2501046 |
RICHARDS BUILDING, 0045 - REPLACE EMERGENCY GENERATOR AND ADD LOAD CONNECTION CABINET |
JIMMY HOSEY |
PENNONI ASSOCIATES INC |
RING POWER CORPORATION |
CONSTRUCTION |
$150,000 |
| 2300293 |
RINGLING - ART MUSEUM (9001) - UPDATE LIGHTING TECHNOLOGY FOR TURRELL |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
FINAL COMPLETION |
$774,488 |
| 2300521 |
RINGLING - ART MUSEUM, 9001 - INSTALL NEW FIRE PANEL |
JOSE MORALES-GONZALEZ |
PINNACLE ENGINEERING GROUP, P.A. |
WILLIS A. SMITH CONSTRUCTION, INC |
BIDDING |
$301,200 |
| 2501137 |
RINGLING - ART MUSEUM, 9001 - REROOF AND DEFERRED MAINTENANCE PHASE II |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
|
HOLD |
$0 |
| 2300178 |
RINGLING - ART MUSEUM, 9001, REROOFING |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$2,432,815 |
| 2300176 |
RINGLING - CA'D ZAN, 9002, REROOFING, |
JOSE MORALES-GONZALEZ |
PLUNKETT RAYSICH ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$1,639,539 |
| 2501245 |
RINGLING - CADZAN, 9002 - DESIGN SERVICES FOR RECOVERY AND MITIGATION OF HISTORIC HOME |
JOSE MORALES-GONZALEZ |
R.J. HEISENBOTTLE ARCHITECTS, P.A |
|
PLANNING |
$315,000 |
| 2601363 |
RINGLING - CENTER FOR THE PERFORMING ARTS, 0450 - REPLACE BOILERS |
JOSE MORALES-GONZALEZ |
PINNACLE ENGINEERING GROUP, P.A. |
WILLIS A. SMITH CONSTRUCTION, INC |
DESIGN |
$50,000 |
| 2501139 |
RINGLING - CIRCUS MUSEUM, 9003 - STORM DAMAGE REPAIRS (10-09-24 HURRICANE MILTON) |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
ROOF CONNECT |
CONSTRUCTION |
$471,000 |
| 2501049 |
RINGLING - WAREHOUSE, 9028 - REMODEL (PHASE II) |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
HOLD |
$1,000,000 |
| 2501254 |
RINGLING ART MUSEUM, 9001 - MOVE EM LIGHTING POWER TO CHAO CENTER GENERATOR |
JOSE MORALES-GONZALEZ |
PINNACLE ENGINEERING GROUP, P.A. |
WILLIS A. SMITH CONSTRUCTION, INC |
BIDDING |
$36,000 |
| 2501204 |
RINGLING CA'D'ZAN, 9002 - ARCHITECTURAL SERVICES FOR HISTORIC PRESERVATION |
JOSE MORALES-GONZALEZ |
|
|
PLANNING |
$24,500 |
| 2501014 |
RINGLING CA'D'ZAN, 9002 - HVAC PHASE II |
JOSE MORALES-GONZALEZ |
ENGINEERING MATRIX |
|
HOLD |
$4,500,000 |
| 2500090 |
RINGLING CA'D'ZAN, HVAC PHASE I, 9002 |
JOSE MORALES-GONZALEZ |
ENGINEERING MATRIX |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$929,942 |
| 2501113 |
RINGLING CAMPUS - SEPTEMBER HURRICANE (HELENE) DAMAGE RESTORATION |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$255,000 |
| 2300522 |
RINGLING CAMPUS SECURITY GATE ON SOUTH DRIVE, 9022 |
JOSE MORALES-GONZALEZ |
ENGINEERING MATRIX |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$214,500 |
| 2300502 |
RINGLING CENTER FOR THE ARTS, THEATER LIGHTING CONTROLS, 0450 |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$374,375 |
| 2400892 |
RINGLING, RUPP PAVILION, ENVELOPE/INTERIOR IMPROVEMENTS, 9011 (VERIFY BLDG #, SCOPE) |
JOSE MORALES-GONZALEZ |
SWEET SPARKMAN ARCHITECTS |
WILLIS A. SMITH CONSTRUCTION, INC |
CONSTRUCTION |
$2,150,471 |
| 2300325 |
ROGERS 5TH FLOOR ABATEMENT AND REMODEL, 0036 |
ELSTON PEETS |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
SUBST COMPLETION |
$1,500,000 |
| 2400741 |
ROGERS VAV REPLACEMENT, 0036 |
ELSTON PEETS |
SIEMENS INDUSTRY INC. |
SIEMENS INDUSTRY INC. |
FINAL COMPLETION |
$718,000 |
| 2300222 |
ROGERS, 0036, BUILDING ENVELOPE, |
ELSTON PEETS |
BKJ INC |
SOUTHERN STANDARD |
CONSTRUCTION |
$900,000 |
| 2300186 |
ROVETTA (A & B),REROOFING,
PVC 0.60MIL |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
SUBST COMPLETION |
$397,200 |
| 2501359 |
ROVETTA BUILDING A, 0023 & B, 0052 - REMODEL SPACE |
DAVID FYFFE |
|
|
PLANNING |
$21,700,000 |
| 2501202 |
ROVETTA BUILDING A, 0052 - REPAIR CRACK IN BRICK FACADE |
ELSTON PEETS |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
|
PLANNING |
$65,160 |
| 2300507 |
SALLEY HALL GENERATOR UPGRADE, 0046 |
BRIAN CANNADY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
HOLD |
$62,500 |
| 2501147 |
SANDELS BUILDING, 0135 - RENOVATE COURTYARD |
JEREMY FLOYD |
KIMLEY-HORN AND ASSOCIATES INC |
|
DESIGN |
$250,000 |
| 2501211 |
SANDELS BUILDING, 0135 - RENOVATE ROOMS 101 AND 108 SEATING AND FLOORING |
OLUWASEYI AKINRINDE |
|
PERDUE INC |
FINAL COMPLETION |
$155,000 |
| 2601438 |
SANDELS BUILDING, 0135 - WAYFINDING SIGNAGE |
DAMARIS BROWN |
|
|
ESTIMATING |
$0 |
| 2300201 |
SANDELS BUILDING, 0135, BULDING ENVELOPE (DEF MAINTENANCE) |
KIM BALL |
GILCHRIST ROSS CROWE ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$2,875,000 |
| 2400654 |
SANDELS RENOVATION FLOORS 1-4, 0135 |
KIM BALL |
AFFILIATED ENGINEERS SE, INC |
MAD DOG DESIGN & CONSTRUCTION CO |
SUBST COMPLETION |
$900,000 |
| 2400858 |
SANDELS, 0135 - FINISHES IMPROVEMENTS IN SUITE 0225 |
MARISSA GUTIERREZ |
HOY AND STARK ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
DESIGN |
$200,708 |
| 2501249 |
SANDELS, 0135 - RENOVATE SUITE 100 |
DAMARIS BROWN |
|
|
DESIGN |
$0 |
| 2300270 |
SANDELS, 0135, HVAC IMPROVEMENTS (PH 1) |
KIM BALL |
|
MAD DOG DESIGN & CONSTRUCTION CO |
FINAL COMPLETION |
$2,737,158 |
| 2501263 |
SEMINOLE BOOSTERS, INC. - RV PARKING SITE ANALYSIS |
JEREMY FLOYD |
|
|
HOLD |
$0 |
| 2400589 |
SHAW BUILDING, EXHAUST/AIR INTAKE FOR FSP/NANOPARTICLE LAB, 0814 |
BRIAN CANNADY |
PINNACLE ENGINEERING GROUP, P.A. |
|
BIDDING |
$20,000 |
| 2501341 |
SLIGER BUILDING - FUQUA RESEARCH COMPLEX, 0804 - RENOVATE 2ND FLOOR |
MARY LOCKHART |
|
|
DESIGN |
$0 |
| 2300274 |
SLIGER, 0804, IAQ, 2ND FLOOR |
MARY LOCKHART |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
SOUTHERN STANDARD |
DESIGN |
$4,000,000 |
| 2400837 |
SLIGER, CHILLER FOR SERVER COOLING AT DATA CENTER, 0804 |
JIMMY HOSEY |
MCGINNISS & FLEMING ENGINEERING, INC. |
MILLERWORKS |
CONSTRUCTION |
$517,935 |
| 2501266 |
SOCCER - SOFTBALL BUILDING, 0385 - REMODEL |
JOHN MARCHANT |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
PLANNING |
$50,000 |
| 2400725 |
SOCCER - SOFTBALL, 0385 - CONSTRUCT POLE BARN |
JOHN MARCHANT |
GILCHRIST ROSS CROWE ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
CONSTRUCTION |
$210,000 |
| 2400583 |
SOCCER SOFTBALL BUILDING RADON MITGATION, 0385 |
JOHN MARCHANT |
ENVIROHOME |
KELLY BROTHERS SHEET METAL |
SUBST COMPLETION |
$50,500 |
| 2501151 |
STONE BUILDING, 0050 - RENOVATE DEAN'S SUITE 1100-1120 |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
DESIGN |
$62,000 |
| 2400978 |
STORMWATER IMPROVEMENTS |
JEREMY FLOYD |
MOORE BASS CONSULTING |
|
DESIGN |
$500,000 |
| 2501299 |
STROZIER LIBRARY, 0134 - INSTALL TRACK LIGHTING |
OLUWASEYI AKINRINDE |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
CONSTRUCTION |
$15,850 |
| 2300435 |
STROZIER LIBRARY, 0134, REMODEL SUB-BASEMENT |
MARY LOCKHART |
GILCHRIST ROSS CROWE ARCHITECTS |
RAM CONSTRUCTION & DEVELOPMENT LLC |
CONSTRUCTION |
$5,000,000 |
| 2300214 |
STROZIER, 0134, ELEVATOR MAINTENANCE (DEFERRED MAINTENANCE) |
ELSTON PEETS |
|
THYSSENKRUPP ELEVATORS |
CONSTRUCTION |
$490,000 |
| 2501066 |
STUDENT SERVICES BUILDING, 0379 - UPGRADE LIGHTING AND LIGHTING CONTROLS IN ROOMS 0201, 0201C, & 0203 |
JIMMY HOSEY |
MCGINNISS & FLEMING ENGINEERING, INC. |
|
DESIGN |
$6,500 |
| 2426300 |
STUDENT UNION, INSTALL AUDIO VISUAL SYSTEMS, 4018 |
KIM BALL |
|
SUN COAST ELECTRIC |
SUBST COMPLETION |
$490,000 |
| 2400889 |
STUDENT UNION, RECONFIGURE 2ND FLOOR DEMOUNTABLE PARTITIONS, 4018 |
KIM BALL |
|
KRUEGER INTERNATION INC |
SUBST COMPLETION |
$39,989 |
| 2601410 |
TANNER HALL, 0076 - RENOVATE ROOMS 0203A, C, & D |
JUSTIN SHAFER |
|
|
PLANNING |
$0 |
| 2601393 |
TANNER HALL, 0076 - RENOVATE ROOMS 209 AND 210 |
JUSTIN SHAFER |
|
|
CONSTRUCTION |
$27,000 |
| 2501243 |
TECHNOLOGY SERVICES BLDG, 0860 - EXPAND WAREHOUSE SPACE |
KRISTINE AZZATO |
|
|
PLANNING |
$0 |
| 2601426 |
TECHNOLOGY SERVICES BUILDING, 0860 - RENOVATE LOBBY |
KRISTINE AZZATO |
|
|
PLANNING |
$0 |
| 2501188 |
THAGARD BUILDING, 0028 - REMODEL BASEMENT |
MARY LOCKHART |
DAG ARCHITECTS INC |
SOUTHERN STANDARD |
DESIGN |
$0 |
| 2400607 |
THAGARD, RADON MITIGATION,0028 |
MARY LOCKHART |
DAG ARCHITECTS INC |
SOUTHERN STANDARD |
DESIGN |
$770,000 |
| 2501035 |
THE CLOCK BUILDING, 2022 - WINDOW REPLACEMENT |
DEWAYNE LOCKHART |
GILCHRIST ROSS CROWE ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
BIDDING |
$1,000,000 |
| 2501354 |
THE CLOCK BUILDING, 2022 - ADA ACCESS RAMP |
DEWAYNE LOCKHART |
GILCHRIST ROSS CROWE ARCHITECTS |
RIPPEE CONSTRUCTION, INC |
CONSTRUCTION |
$29,037 |
| 2601408 |
THE CLOCK BUILDING, 2022 - REMODEL 304, 305, 306, 307, 311D/E, AND 312 |
GEORGE JOHNSON |
|
|
ESTIMATING |
$0 |
| 2501055 |
THE LAB - BUILDING A AND THE LAB - BUILDING B, 0470 AND 0471, RENOVATION |
GEORGE JOHNSON |
|
|
DESIGN |
$539,000 |
| 2501125 |
THEATRE PROPERTY - 1501 GOVERNOR'S SQUARE BLVD, 7403 - TORCHLIGHT STUDIOS EXTERIOR AND INTERIOR IMPROVEMENTS |
JOHN MARCHANT |
LEWIS AND WHITLOCK ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
BIDDING |
$360,000 |
| 2601367 |
THRASHER BUILDING - COM, 4001 - REMODEL 2140E TO OFFICE SPACE FOR NEW HIRES |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$0 |
| 2400587 |
TUCKER CENTER CHILLER REPLACEMENT, 4546 |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
TRANE TALLAHASSEE |
CONSTRUCTION |
$3,686,430 |
| 2401011 |
TUCKER CIVIC CENTER, 4546 - INVESTIGATE SEWER PIPING IN RESTROOMS C0010 AND C0011 |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
MILLERWORKS |
CONSTRUCTION |
$51,000 |
| 2601396 |
TUCKER CIVIC CENTER, 4546 - REPLACE EXTERIOR DIGITAL SIGNS |
GEORGE JOHNSON |
|
|
CONSTRUCTION |
$175,000 |
| 2400879 |
TUCKER CIVIC CENTER, DEFERRED MAINTENANCE/HVAC, 4546 |
JIMMY HOSEY |
|
|
HOLD |
$2,000,000 |
| 2400824 |
TUCKER CIVIC CENTER, PARKING LOT REPAVING, 4546 |
JOSE MORALES-GONZALEZ |
MOORE BASS CONSULTING |
C W ROBERTS CONTRACTING INC |
CONSTRUCTION |
$4,700,000 |
| 2300535 |
TULLY GYM COURT LIGHTING UPGRADES, 0132 |
BRIAN CANNADY |
|
|
FINAL COMPLETION |
$334,000 |
| 2300344 |
TULLY GYM, 0132, IAQ |
JOHN MARCHANT |
LEWIS AND WHITLOCK ARCHITECTS |
|
HOLD |
$430,000 |
| 2300184 |
TURNBULL CONF CTR, 0010, REROOF,
SINGLE PLY OVERLAY OF EXISTING ROOF
NO DESIGN |
ELSTON PEETS |
GARLAND/DBS, INC |
GARLAND/DBS, INC |
FINAL COMPLETION |
$750,000 |
| 2300237 |
TURNBULL CONF CTR, 0010, BUILDING ENVELOPE |
BRIAN CANNADY |
BARNETT FRONCZAK BARLOWE ARCHITECTS |
OMNICON CORP |
CONSTRUCTION |
$628,269 |
| 2300429 |
TURNBULL CONFERENCE CENTER, REMODEL CONFERENCE ROOM/KITCHEN, 0010 |
JOSE MORALES-GONZALEZ |
ELLIOTT MARSHALL INNES PA (EMI) |
SOUTHERN STANDARD |
CONSTRUCTION |
$7,500,000 |
| 2300310 |
UCA CHILLED WATER LOOP EXTENSION, 0223 |
JIMMY HOSEY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
CHILDERS CONSTRUCTION CO |
CONSTRUCTION |
$4,100,000 |
| 2400781 |
UCA, 0223 - REMODEL SUITE 1400 |
OLUWASEYI AKINRINDE |
LEWIS AND WHITLOCK ARCHITECTS |
OLIVER SPERRY RENOVATION & CONSTRUCTION |
SUBST COMPLETION |
$147,412 |
| 2400793 |
UCA, INTERNATIONAL PROGRAMS, 5507A BREAKROOM MODIFICATIONS, 0223 |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
|
DESIGN |
$8,200 |
| 2400745 |
UNION LOADING DOCK DOOR REPLACEMENT, 4018 |
BRIAN CANNADY |
|
MILLS & MCKINNON CONTRACTORS, INC |
SUBST COMPLETION |
$98,800 |
| 2300489 |
UNIVERSITY CENTER (UCA), 0223 - DEFERRED MAINTENANCE, ELEVATOR UPGRADES |
ELSTON PEETS |
THE DODSTONE GROUP ARCHITECTS INC |
|
HOLD |
$735,000 |
| 2601419 |
UNIVERSITY CENTER - BUILDING A, 0223 - ENCLOSE ROOM A3902 DOORWAY |
DAMARIS BROWN |
|
|
PLANNING |
$58,000 |
| 2501213 |
UNIVERSITY CENTER - BUILDING B, 0224 - RENOVATE ROOM 2104 SEATING AND FLOORING |
OLUWASEYI AKINRINDE |
|
PERDUE INC |
FINAL COMPLETION |
$75,000 |
| 2501317 |
UNIVERSITY CENTER - BUILDING C, 0225 - NEW FRONT AND HALLWAY DOORS SUITE 4600C |
OLUWASEYI AKINRINDE |
|
|
DESIGN |
$0 |
| 2501270 |
UNIVERSITY CENTER - BUILDING D, 0226 - REMODEL 3RD FLOOR |
JEREMY FLOYD |
LEWIS AND WHITLOCK ARCHITECTS |
MAD DOG DESIGN & CONSTRUCTION CO |
DESIGN |
$500,000 |
| 2501346 |
UNIVERSITY CENTER A - REMODEL SUITE ACCESS |
GEORGE JOHNSON |
|
|
PLANNING |
$0 |
| 2501109 |
UNIVERSITY CENTER A, 0223 - REMODEL ROOMS A5505, A5508 AND A5509 |
OLUWASEYI AKINRINDE |
LEWIS AND WHITLOCK ARCHITECTS |
OLIVER SPERRY RENOVATION & CONSTRUCTION |
SUBST COMPLETION |
$87,772 |
| 2400882 |
UNIVERSITY CENTER A/B/C/D STORM DAMAGE REPAIRS (5-10-24), 0223, 0224, 0225, 0226 |
JOHN MARCHANT |
MLD ARCHITECTS |
ROOF CONNECT |
SUBST COMPLETION |
$1,100,000 |
| 2400746 |
UNIVERSITY CENTER B 4TH & 5TH FLOOR, FINISH UPGRADES, 0224 |
BRIAN CANNADY |
IN-HOUSE DESIGN |
SOUTHERN STANDARD |
SUBST COMPLETION |
$190,000 |
| 2501235 |
UNIVERSITY CENTER B, 0224 - RENOVATE 2ND FLOOR LOBBY AREA |
BRIAN CANNADY |
DAG ARCHITECTS INC |
|
DESIGN |
$15,765 |
| 2501152 |
UNIVERSITY CENTER B, 0224 - REPAIR COLUMN AT FRONT OF BUILDING |
ELSTON PEETS |
PENNONI ASSOCIATES INC |
|
DESIGN |
$29,905 |
| 2200112 |
UNIVERSITY CENTER B, 1ST FL RESTROOMS RENOVATION, 0224 |
BRIAN CANNADY |
PINNACLE ENGINEERING GROUP, P.A. |
MAD DOG DESIGN & CONSTRUCTION CO |
SUBST COMPLETION |
$750,000 |
| 2601429 |
UNIVERSITY CENTER BUILDING A, 0223 - REMODEL ROOM A6300 |
DAMARIS BROWN |
|
|
ESTIMATING |
$0 |
| 2300459 |
UNIVERSITY CENTER BUILDING B, 2103 AND ATRIUM INTERIOR RENOVATION, 0224 |
BRIAN CANNADY |
DAG ARCHITECTS INC |
MAD DOG DESIGN & CONSTRUCTION CO |
SUBST COMPLETION |
$919,907 |
| 2300158 |
UNIVERSITY CENTER BUILDINGS, 0223,0224,0225,0226, FIRE & LIFE SAFETY |
DAVID FYFFE |
SIEMENS INDUSTRY INC. |
SIEMENS INDUSTRY INC. |
CONSTRUCTION |
$1,200,000 |
| 2300150 |
UNIVERSITY CENTER C & D, 0226 AND 0227, REROOFING, REPLACE FLAT ROOF, REMOVE CLAY TILE, ADD UNDERLAYMENT, REPLACE DAMAGED TILE. |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
CONSTRUCTION |
$1,165,000 |
| 2400838 |
UNIVERSITY CENTER C (UCC), 0225, REMODEL EXISTING OFFICES IN CCI SUITE |
TONYARI SCOTT |
DAG ARCHITECTS INC |
|
DESIGN |
$0 |
| 2400652 |
UNIVERSITY CENTER C (UCC), C2518, C2526 OFFICE RENOVATION, 0225 |
BRIAN CANNADY |
IN-HOUSE DESIGN |
MILLS & MCKINNON CONTRACTORS, INC |
FINAL COMPLETION |
$99,844 |
| 2400902 |
UNIVERSITY CENTER C, 5505 BREAKROOM RENOVATION FOR UBA, 0225 |
TONYARI SCOTT |
|
|
HOLD |
$30,000 |
| 2400640 |
UNIVERSITY CENTER D, SUITE 4200 OFFICE RENOVATION, 0226 |
JOHN MARCHANT |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
FINAL COMPLETION |
$350,000 |
| 2501230 |
VERTICAL TRANSPORTATION - CAMPUS STANDARD DEVELOPMENT |
JOHN MARCHANT |
|
|
BIDDING |
$20,000 |
| 2400619 |
VETERANS LEGACY COMPLEX, CONSTRUCT BUILDING |
DEWAYNE LOCKHART |
|
|
PLANNING |
$37,500,000 |
| 2501289 |
W PARK AVENUE - RAZE FACILITIES (3) |
MARISSA GUTIERREZ |
|
|
PLANNING |
$100,000 |
| 2501206 |
WESTCOTT BUILDING, 0001 - CONSTRUCT GOLF CART PARKING AREA |
JEREMY FLOYD |
|
|
FINAL COMPLETION |
$28,750 |
| 2501216 |
WESTCOTT PLAZA - FOUNTAIN IMPROVEMENTS |
JEREMY FLOYD |
KIMLEY-HORN AND ASSOCIATES INC |
|
HOLD |
$33,000 |
| 2400836 |
WESTCOTT, 0001 - ROOMS 0313Q AND 0315 MODIFICATIONS |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
CONSTRUCTION SOLUTIONS LLC |
DESIGN |
$105,000 |
| 2300163 |
WESTCOTT, 0001, REROOFING, 060MIL PVC-STANDING SEAM-ROOF CONNECT |
ELSTON PEETS |
MLD ARCHITECTS |
ROOF CONNECT |
FINAL COMPLETION |
$500,000 |
| 2501036 |
WESTCOTT, 0001, SPACE STUDY |
GEORGE JOHNSON |
|
|
PLANNING |
$0 |
| 2400773 |
WESTCOTT, 2ND FLOOR OVPR OFFICE RECONFIGURATION, 0001 |
TONYARI SCOTT |
IN-HOUSE DESIGN |
SOUTHERN STANDARD |
FINAL COMPLETION |
$130,000 |
| 2501138 |
WFSU, 8018 - OPERATION BEACON HD TRANSMITTER & MICROWAVE REPLACEMENT |
KIM BALL |
|
|
CONSTRUCTION |
$246,000 |
| 2501307 |
WILDWOOD HALLS 1 - BATHROOM/SHOWER REPLACEMENT |
BRIAN CANNADY |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
PLANNING |
$0 |
| 2501330 |
WILDWOOD HALLS 2, 4021 - REPLACE FLOORING, PAINT WALLS AND TRIM |
BRIAN CANNADY |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
PLANNING |
$0 |
| 2501058 |
WILDWOOD HALLS 2, 4021 - SHOWER RENOVATION AND FINISH UPGRADES |
BRIAN CANNADY |
BKJ INC |
MAD DOG DESIGN & CONSTRUCTION CO |
BIDDING |
$2,700,000 |
| 2501331 |
WILDWOOD HALLS 2, 4021 - UPGRADE GENERATOR |
BRIAN CANNADY |
TOMAHAWK ENGINEERING AND CONSULTING, INC |
|
HOLD |
$0 |
| 2501228 |
WILLIAM JOHNSTON BUILDING, 0017 - TEXTILE TEACHING LABS CONTINUATION TO 2300491 |
TONYARI SCOTT |
LEWIS AND WHITLOCK ARCHITECTS |
SOUTHERN STANDARD |
CONSTRUCTION |
$95,000 |
| 2601441 |
WILLIAMS BUILDING AND MCCOLLUMN HALL, 0003 & 0075 - INSTALL GENERATORS FOR AT&T TOWERS |
DAVID FYFFE |
|
|
HOLD |
$0 |
| 2300252 |
WILLIAMS, 0003, BUILDING ENVELOPE |
ELSTON PEETS |
BKJ INC |
TO BE DETERMINED |
CONSTRUCTION |
$300,000 |
| 2601376 |
WOMENS LACROSSE TEMPORARY FACILITY, 8998 - INSTALL TEMPORARY BUILDING |
JEREMY FLOYD |
|
|
CONSTRUCTION |
$249,571 |